Investor view / Synthetic mechanics v1.0

See the asset.
See who bears the risk.

A transparent working view of the Multi-Project Milestone Participation: one claim across ten cellular-agriculture projects, with milestone-controlled funding and explicitly shared risks.

Bioreactor vessels and cellular-agriculture process equipment arranged as an analytical collage

01 / One pool, three constructions

What changes when protection changes?

Select instrument construction
Expected investor NPVAt assumed 8% discount rate
0.662DEMO million
central mix
Adverse witness−18.718Favourable witness15.440

Range endpoints use different feasible probability witnesses. They are not a confidence interval and cannot be combined into one forecast.

Investor cash paid94.624Expected, including pool cost
Total cash received121.649Projects and recoveries
Resolved loss retained9.981Expected principal loss
Continuing exposure8.520Not cash; not yet loss

Validated analytical preview. Construction values retain the frozen C++ synthetic fixture; the financeability boundary is also computed in-browser by the published C++ WebAssembly module. Neither is market calibration.

Emscripten Release 73/73 · Published WASM byte parity · Reconciliations 0

02 / Meet the underlying claims

Ten projects. One disclosed reference schedule.

The pool spans research through repeat production to test one common financial interface. That diversity is analytical; it is not evidence that a live mixed-stage issuance would be admissible.

Selected claim

Cell-line and media platform

Research

Reference limit
6.000
Milestone draws · m0 / m12 / m24
2.400 / 1.800 / 1.800
Performing receipt
11.400 at month 60
Shared exposure
Biology · Supplier

03 / Follow the money

Every receipt keeps its source.

Project cash, recovery, returned reserves and third-party support remain separate. The chart uses the selected construction’s central synthetic measure.

Commercial
77.149
Licensing / royalty
40.827
Cash recovery
3.673
External provider
0.000
Returned reserve
0.000

Returned reserve is capital, not profit. External support is a transfer, not project performance.

Central cash readingUnsupported core
Investor cash paid94.624
Total cash received121.649
Continuing principal
8.520
Gross resolved loss
9.981
Loss retained by investor
9.981
Naturalehia take
0.000

Continuing principal is exposure—not cash and not yet realized loss.

What this construction changes

Combines milestone claims and makes cash, exposure, loss, return and dependence measurable.

What it does not change

It does not improve project cash or remove common shocks.

04 / Shared exposure

Pooling is only useful after correlation.

Select a factor to see which claims can move together. Overlapping notionals cannot be added; one project can carry several common risks.

Exposure of each synthetic project claim to five shared risk factors
Central loss tail

Some diversification at 95%. None at 99%.

Pooling reduces central ES95 by 7.914, or 10.05%. In the more severe ES99 tail, the systemic path dominates and the measured benefit is zero.

ES95 standalone sum78.717
ES95 pooled70.803
ES99 standalone90.000
ES99 pooled90.000

05 / Nine complete joint paths

Defaults are not multiplied as if independent.

Choose a joint state. Every claim receives an explicit path code, producing one reconciled pool loss and continuing-exposure result.

Selected state

All perform

Central weight58%
Realized principal loss
0.000
Continuing exposure
0.000
Permitted weight range
40%–72%
P PerformsD ContinuingE Stops after first drawL Stops after two drawsC Resolves with 10% recovery

06 / Common-hurdle comparison

Protection improves position—not underlying economics.

Central and adverse expected NPV are shown on one common scale where the 8% comparison is valid. The zero line is the decision boundary, not a promise of market value.

Funded stack: central prefunding drag is 8.984. Its first-loss and priority classes also fail their separate stated hurdles.

Guarantee: the provider-performing result excludes premium. The modeled all-in support gap is 28.467; wrong-way provider credit raises it to 28.702.

07 / Conditional issue boundary

Where investor value and issuer funding overlap.

Each row tests one supplied hurdle independently. The investor ceiling U protects the stated return requirement; the issuer floor L protects the complete issue funding identity.

Synthetic physical-measure sensitivity; not fair value, a bid, an observed hurdle, provider capacity, or evidence of demand.

Model unavailable Financeability-window output has not been published for this instrument.

The page will show tested investor ceilings, issuer floors, reference price and support gaps only after a verified model result is supplied.

08 / From model to investable asset

What must become real.

The model is valuable because it can refuse weak terms. A live instrument requires evidence strong enough to replace every invented economic input.

Implemented

Mechanics we can reproduce

  • Cash and principal identities
  • Joint state evaluation
  • Loss, tail and tranche allocation
  • Provider exposure and credit stress
  • Zero reconciliation controls
Synthetic

Economics used to test the machinery

  • Cash, recovery and draw amounts
  • Probability ranges and dependence
  • Investor and provider hurdles
  • Success participation rights
  • Protection terms and capacity
Unknown

Facts required before live use

  • Enforceable project cash rights
  • Authenticated milestone evidence
  • Empirical loss and recovery data
  • Investor demand and market hurdle
  • Provider authority and capacity

Public mechanism ledger

Three precedents. Zero calibration-eligible observations.

Each record sharpens the contract and diligence questions. None yet supplies the complete matched cash, loss and independent price evidence required to estimate investor return.

Read the empirical boundary
RecordPublicly reported mechanismModel authority
Liberation Labs 2024–25Private secured notes with promised interest and conversion Controlled dossierMechanism only / no model input
Solar Foods Factory 01 2022–25Gas-fermentation protein facility—an operating-risk class distinct from cultivated meat—with an amortizing facility and named export-credit guarantors Controlled dossierMechanism only / no model input
Meatable Innovation Credit 2024 award / 2025 wind-down resolution announcedIssuer-reported award; later investor RNS reports a resolution to dissolve and wind down after continued funding was unavailable. Public-credit default, remission and recovery remain unknown Controlled dossierMechanism only / no model input

Admission result3 controlled dossiers assembled · 0 calibration-eligible · market hurdle not identified

Current economic conclusion

Synthetic mechanics verified; market price not identified.
Not yet shown attractive or financeable.
Read the candidate term sheet

Open-standard commitment

No rent to us.

Naturalehia retains no protocol fee, carried interest, instrument royalty, or share of financed-company receipts. Underlying project claims may still assign capped commercial, licensing, royalty, capacity, offtake, or exit cash to investors.

Author take
0.000

The honest boundary

Packaging creates no cash.

The model separates project receipts, recoveries and external support. A tranche can move loss; a guarantee can transfer it. Neither can repair missing commercial value, and no payment is assigned to Naturalehia.

Read the short instrument document